翻訳と辞書
Words near each other
・ Max Planck Institute of Immunobiology and Epigenetics
・ Max Oates
・ Max Obal
・ Max Oberrauch
・ Max Ochs
・ Max Oehler
・ Max Oelschlaeger
・ Max Oertli
・ Max Olding and Pamela Page
・ Max Oldmeadow
・ Max Olivier
・ Max Olivier-Lacamp
・ Max on the Rox
・ Max Ophüls
・ Max Oppy
MAX Orange Line
・ Max Orr
・ Max Orrin
・ Max Ortmann
・ Max Osborne
・ Max Otte
・ Max Otten
・ Max Otto Koischwitz
・ Max Overgaard
・ Max Pacioretty
・ Max Padlow
・ Max Page
・ Max Page (disambiguation)
・ Max Palevsky
・ Max Pallenberg


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

MAX Orange Line : ウィキペディア英語版
The MAX Orange Line, also known as the Portland–Milwaukie Light Rail Project, is a light rail line in the Metropolitan Area Express light rail system in Portland, Oregon. The $1.49 billion project is the second part of a two-phase transportation plan known as the South Corridor Project, bringing light rail service to Clackamas County. Starting in downtown Portland and following the Portland Transit Mall, the Orange Line runs between Union Station and Milwaukie, terminating at Park Avenue, in unincorporated Clackamas County just outside Milwaukie proper. The first construction work, related to the new Tilikum Crossing over the Willamette River began on June 30, 2011, and the line opened for service on September 12, 2015.The Orange Line was built off of the downtown terminus of the Green and Yellow Lines, at Portland State University. During planning and construction, the new bridge being built for the line used the temporary name of Portland–Milwaukie Light Rail Bridge, but in April 2014 it was officially named Tilikum Crossing, Bridge of the People. From there, the line turns south and continues into Southeast Portland. The stations serve the Oregon Museum of Science and Industry, the Brooklyn neighborhood, and Milwaukie, Oregon through the McLoughlin Boulevard corridor. As part of construction, safety improvements were made at the SE 8th, 11th, and 12th avenues crossings in Southeast Portland, and the SE Mailwell Drive, SE Harrison, Monroe and Washington streets, and 21st Avenue crossings in Milwaukie.(【引用サイトリンク】url=http://trimet.org/pdfs/pm/Safety/Safety_Fact_Sheet_Mar2015.pdf ) This allows these crossings to be designated quiet zones, where Union Pacific Railroad, Portland and Western Railroad and MAX trains do not have to blow their horns when passing through.==History==In the early 1970s, a light rail line was proposed in this corridor. It would have run from Downtown Portland via the Hawthorne Bridge to Oregon City, primarily along the old Portland Traction Company right-of-way. This route was to be the first of five light rail lines which would have run over existing rail lines in the Portland region. The hope was to get this Portland – Oregon City line running as soon as possible by using secondhand PCC streetcars from Toronto until brand new Boeing light rail vehicles could be obtained. The light rail line was shelved when the planned Mount Hood Freeway was canceled in the mid-1970s and the region's transportation planning redirected to transit alternatives to the Mount Hood Freeway in the Portland – Gresham corridor.In the mid-1990s, light rail was planned again along much of this corridor as part of the proposed "South-North Light Rail" line which was to have run from Clackamas Town Center to Milwaukie, then north to Downtown Portland and along Interstate Avenue to Vancouver, Washington. In November 1994, "nearly two-thirds"Oliver, Gordon (November 10, 1994). "One down, more to go for reality of north-south rail line". ''The Oregonian'', p. C10. of voters in the Oregon part of the Portland metropolitan area voted in support of a $475 million bond issue to provide the local-area share (Oregon portion) of the project's estimated $2.8 billion cost. However, three months later, a majority of voters in Clark County, Washington, rejected a bond issue to provide that county's $237.5 million share of the South-North project's funding,Oliver, Gordon (February 8, 1995). "Clark County turns down north-south light rail". ''The Oregonian'', p. 1. leading eventually to those plans' being shelved. (Plans for a MAX line north from downtown Portland along Interstate Avenue were later revived, as the Yellow Line, but without the portion extending across the Columbia River to Vancouver, and this opened in 2004.)Planning for light rail connecting Portland with Clackamas County later resumed. After public meetings it was decided that the first MAX line to Clackamas County should be along Interstate 205, from Gateway to Clackamas Town Center, but that this would be phase 1 of a two-part expansion of the MAX system, with a Portland–Milwaukie line as phase 2. The I-205 line opened in 2009, as the MAX Green Line.Meanwhile, planning for the Portland–Milwaukie line continued, including study of, and public input on, several different alternatives for the exact route. In 2008, the Locally Preferred Alternative was chosen. The MAX Light Rail to Milwaukie would terminate at Park Avenue station rather than Lake Road, as originally planned in 2003.On April 5, 2011, the Federal Transit Administration approved the start of the project's final design; at that time, design work was roughly thirty percent complete and projected to be finished in about a year. The approval meant that TriMet could begin purchasing right-of-way and some construction materials.Construction began on June 30, 2011, initially limited to work at the site of Tilikum Crossing over the Willamette River, but right-of-way preparation work (such as removal of trees) began in the southern part of downtown Portland in late September 2011.In July 2013, the project reached 50-percent completion. The line was tentatively scheduled to open on September 12, 2015.As construction finished in March 2015, the line was under budget in the range of $10 million to $40 million. After a petition from Jeff Merkley, the Federal Transit Administration approved the addition of switch heaters, catenary ice caps, and additional station shelters, totaling $3.6 million, which were deferred from the original plans during the funding agreement with the FTA. However, the remaining 50% matching funds from the FTA must be returned, leaving the excess local funds in the range of $5 million to $20 million after the funding process is complete in 2019. These TriMet bond funds can only be used for capital projects, due to the conditions under which they were raised.On May 15, 2015, the first trips run with passengers at regular operating speed along the full Orange Line carried around 500 people, including Governor Kate Brown and Senator Jeff Merkley.On August 30, 2015, test trains began running along the entire Orange Line route, in advance of the September 12 opening date. The line opened for service on September 12 at 11 a.m.

The MAX Orange Line, also known as the Portland–Milwaukie Light Rail Project, is a light rail line in the Metropolitan Area Express light rail system in Portland, Oregon. The $1.49 billion project is the second part of a two-phase transportation plan known as the South Corridor Project, bringing light rail service to Clackamas County. Starting in downtown Portland and following the Portland Transit Mall, the Orange Line runs between Union Station and Milwaukie, terminating at Park Avenue, in unincorporated Clackamas County just outside Milwaukie proper. The first construction work, related to the new Tilikum Crossing over the Willamette River began on June 30, 2011, and the line opened for service on September 12, 2015.
The Orange Line was built off of the downtown terminus of the Green and Yellow Lines, at Portland State University. During planning and construction, the new bridge being built for the line used the temporary name of Portland–Milwaukie Light Rail Bridge, but in April 2014 it was officially named Tilikum Crossing, Bridge of the People. From there, the line turns south and continues into Southeast Portland. The stations serve the Oregon Museum of Science and Industry, the Brooklyn neighborhood, and Milwaukie, Oregon through the McLoughlin Boulevard corridor. As part of construction, safety improvements were made at the SE 8th, 11th, and 12th avenues crossings in Southeast Portland, and the SE Mailwell Drive, SE Harrison, Monroe and Washington streets, and 21st Avenue crossings in Milwaukie.〔(【引用サイトリンク】url=http://trimet.org/pdfs/pm/Safety/Safety_Fact_Sheet_Mar2015.pdf )〕 This allows these crossings to be designated quiet zones, where Union Pacific Railroad, Portland and Western Railroad and MAX trains do not have to blow their horns when passing through.
==History==
In the early 1970s, a light rail line was proposed in this corridor. It would have run from Downtown Portland via the Hawthorne Bridge to Oregon City, primarily along the old Portland Traction Company right-of-way. This route was to be the first of five light rail lines which would have run over existing rail lines in the Portland region. The hope was to get this Portland – Oregon City line running as soon as possible by using secondhand PCC streetcars from Toronto until brand new Boeing light rail vehicles could be obtained. The light rail line was shelved when the planned Mount Hood Freeway was canceled in the mid-1970s and the region's transportation planning redirected to transit alternatives to the Mount Hood Freeway in the Portland – Gresham corridor.
In the mid-1990s, light rail was planned again along much of this corridor as part of the proposed "South-North Light Rail" line which was to have run from Clackamas Town Center to Milwaukie, then north to Downtown Portland and along Interstate Avenue to Vancouver, Washington. In November 1994, "nearly two-thirds"〔Oliver, Gordon (November 10, 1994). "One down, more to go for reality of north-south rail line". ''The Oregonian'', p. C10.〕 of voters in the Oregon part of the Portland metropolitan area voted in support of a $475 million bond issue to provide the local-area share (Oregon portion) of the project's estimated $2.8 billion cost.〔 However, three months later, a majority of voters in Clark County, Washington, rejected a bond issue to provide that county's $237.5 million share of the South-North project's funding,〔Oliver, Gordon (February 8, 1995). "Clark County turns down north-south light rail". ''The Oregonian'', p. 1.〕 leading eventually to those plans' being shelved. (Plans for a MAX line north from downtown Portland along Interstate Avenue were later revived, as the Yellow Line, but without the portion extending across the Columbia River to Vancouver, and this opened in 2004.)
Planning for light rail connecting Portland with Clackamas County later resumed. After public meetings it was decided that the first MAX line to Clackamas County should be along Interstate 205, from Gateway to Clackamas Town Center, but that this would be phase 1 of a two-part expansion of the MAX system, with a Portland–Milwaukie line as phase 2. The I-205 line opened in 2009, as the MAX Green Line.
Meanwhile, planning for the Portland–Milwaukie line continued, including study of, and public input on, several different alternatives for the exact route. In 2008, the Locally Preferred Alternative was chosen. The MAX Light Rail to Milwaukie would terminate at Park Avenue station rather than Lake Road, as originally planned in 2003.
On April 5, 2011, the Federal Transit Administration approved the start of the project's final design; at that time, design work was roughly thirty percent complete and projected to be finished in about a year.〔 The approval meant that TriMet could begin purchasing right-of-way and some construction materials.
Construction began on June 30, 2011, initially limited to work at the site of Tilikum Crossing over the Willamette River, but right-of-way preparation work (such as removal of trees) began in the southern part of downtown Portland in late September 2011.
In July 2013, the project reached 50-percent completion. The line was tentatively scheduled to open on September 12, 2015.
As construction finished in March 2015, the line was under budget in the range of $10 million to $40 million. After a petition from Jeff Merkley, the Federal Transit Administration approved the addition of switch heaters, catenary ice caps, and additional station shelters, totaling $3.6 million, which were deferred from the original plans during the funding agreement with the FTA. However, the remaining 50% matching funds from the FTA must be returned, leaving the excess local funds in the range of $5 million to $20 million after the funding process is complete in 2019. These TriMet bond funds can only be used for capital projects, due to the conditions under which they were raised.
On May 15, 2015, the first trips run with passengers at regular operating speed along the full Orange Line carried around 500 people, including Governor Kate Brown and Senator Jeff Merkley.
On August 30, 2015, test trains began running along the entire Orange Line route, in advance of the September 12 opening date. The line opened for service on September 12 at 11 a.m.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「The MAX Orange Line, also known as the Portland–Milwaukie Light Rail Project, is a light rail line in the Metropolitan Area Express light rail system in Portland, Oregon. The $1.49 billion project is the second part of a two-phase transportation plan known as the South Corridor Project, bringing light rail service to Clackamas County. Starting in downtown Portland and following the Portland Transit Mall, the Orange Line runs between Union Station and Milwaukie, terminating at Park Avenue, in unincorporated Clackamas County just outside Milwaukie proper. The first construction work, related to the new Tilikum Crossing over the Willamette River began on June 30, 2011, and the line opened for service on September 12, 2015.The Orange Line was built off of the downtown terminus of the Green and Yellow Lines, at Portland State University. During planning and construction, the new bridge being built for the line used the temporary name of Portland–Milwaukie Light Rail Bridge, but in April 2014 it was officially named Tilikum Crossing, Bridge of the People. From there, the line turns south and continues into Southeast Portland. The stations serve the Oregon Museum of Science and Industry, the Brooklyn neighborhood, and Milwaukie, Oregon through the McLoughlin Boulevard corridor. As part of construction, safety improvements were made at the SE 8th, 11th, and 12th avenues crossings in Southeast Portland, and the SE Mailwell Drive, SE Harrison, Monroe and Washington streets, and 21st Avenue crossings in Milwaukie.(【引用サイトリンク】url=http://trimet.org/pdfs/pm/Safety/Safety_Fact_Sheet_Mar2015.pdf ) This allows these crossings to be designated quiet zones, where Union Pacific Railroad, Portland and Western Railroad and MAX trains do not have to blow their horns when passing through.==History==In the early 1970s, a light rail line was proposed in this corridor. It would have run from Downtown Portland via the Hawthorne Bridge to Oregon City, primarily along the old Portland Traction Company right-of-way. This route was to be the first of five light rail lines which would have run over existing rail lines in the Portland region. The hope was to get this Portland – Oregon City line running as soon as possible by using secondhand PCC streetcars from Toronto until brand new Boeing light rail vehicles could be obtained. The light rail line was shelved when the planned Mount Hood Freeway was canceled in the mid-1970s and the region's transportation planning redirected to transit alternatives to the Mount Hood Freeway in the Portland – Gresham corridor.In the mid-1990s, light rail was planned again along much of this corridor as part of the proposed "South-North Light Rail" line which was to have run from Clackamas Town Center to Milwaukie, then north to Downtown Portland and along Interstate Avenue to Vancouver, Washington. In November 1994, "nearly two-thirds"Oliver, Gordon (November 10, 1994). "One down, more to go for reality of north-south rail line". ''The Oregonian'', p. C10. of voters in the Oregon part of the Portland metropolitan area voted in support of a $475 million bond issue to provide the local-area share (Oregon portion) of the project's estimated $2.8 billion cost. However, three months later, a majority of voters in Clark County, Washington, rejected a bond issue to provide that county's $237.5 million share of the South-North project's funding,Oliver, Gordon (February 8, 1995). "Clark County turns down north-south light rail". ''The Oregonian'', p. 1. leading eventually to those plans' being shelved. (Plans for a MAX line north from downtown Portland along Interstate Avenue were later revived, as the Yellow Line, but without the portion extending across the Columbia River to Vancouver, and this opened in 2004.)Planning for light rail connecting Portland with Clackamas County later resumed. After public meetings it was decided that the first MAX line to Clackamas County should be along Interstate 205, from Gateway to Clackamas Town Center, but that this would be phase 1 of a two-part expansion of the MAX system, with a Portland–Milwaukie line as phase 2. The I-205 line opened in 2009, as the MAX Green Line.Meanwhile, planning for the Portland–Milwaukie line continued, including study of, and public input on, several different alternatives for the exact route. In 2008, the Locally Preferred Alternative was chosen. The MAX Light Rail to Milwaukie would terminate at Park Avenue station rather than Lake Road, as originally planned in 2003.On April 5, 2011, the Federal Transit Administration approved the start of the project's final design; at that time, design work was roughly thirty percent complete and projected to be finished in about a year. The approval meant that TriMet could begin purchasing right-of-way and some construction materials.Construction began on June 30, 2011, initially limited to work at the site of Tilikum Crossing over the Willamette River, but right-of-way preparation work (such as removal of trees) began in the southern part of downtown Portland in late September 2011.In July 2013, the project reached 50-percent completion. The line was tentatively scheduled to open on September 12, 2015.As construction finished in March 2015, the line was under budget in the range of $10 million to $40 million. After a petition from Jeff Merkley, the Federal Transit Administration approved the addition of switch heaters, catenary ice caps, and additional station shelters, totaling $3.6 million, which were deferred from the original plans during the funding agreement with the FTA. However, the remaining 50% matching funds from the FTA must be returned, leaving the excess local funds in the range of $5 million to $20 million after the funding process is complete in 2019. These TriMet bond funds can only be used for capital projects, due to the conditions under which they were raised.On May 15, 2015, the first trips run with passengers at regular operating speed along the full Orange Line carried around 500 people, including Governor Kate Brown and Senator Jeff Merkley.On August 30, 2015, test trains began running along the entire Orange Line route, in advance of the September 12 opening date. The line opened for service on September 12 at 11 a.m.」の詳細全文を読む